
0020201925100 ALPEN-MAYKESTAG


Category: Drills for Metal
Description: Drill bit; for metal; Ø: 19.25mm; L: 238mm; high speed steel
Type of power tool accessories: drill bit
Tools application: cast iron; copper alloy; graphite; steel; tool steel
Drill features: grind blade
Material: high speed steel
Manufacture class: industrial
Drill diameter: 19.25mm
Working part length: 140mm
Length: 238mm
Manufacturer series: MAYKESTAG
Kind of package: film; separately
Conform to the norm: DIN 338 RN
Kind of drill bit: for metal
Anzahl je Verpackung: 1 Stücke
auf Bestellung 1 Stücke:
Lieferzeit 7-14 Tag (e)
Anzahl | Preis |
---|---|
1+ | 71.5 EUR |
10+ | 44.74 EUR |
Produktrezensionen
Produktbewertung abgeben
Technische Details 0020201925100 ALPEN-MAYKESTAG
Category: Drills for Metal, Description: Drill bit; for metal; Ø: 19.25mm; L: 238mm; high speed steel, Type of power tool accessories: drill bit, Tools application: cast iron; copper alloy; graphite; steel; tool steel, Drill features: grind blade, Material: high speed steel, Manufacture class: industrial, Drill diameter: 19.25mm, Working part length: 140mm, Length: 238mm, Manufacturer series: MAYKESTAG, Kind of package: film; separately, Conform to the norm: DIN 338 RN, Kind of drill bit: for metal, Anzahl je Verpackung: 1 Stücke.
Weitere Produktangebote 0020201925100 nach Preis ab 71.5 EUR bis 71.5 EUR
Foto | Bezeichnung | Hersteller | Beschreibung |
Verfügbarkeit |
Preis | ||||
---|---|---|---|---|---|---|---|---|---|
![]() |
0020201925100 | Hersteller : ALPEN-MAYKESTAG |
![]() ![]() Description: Drill bit; for metal; Ø: 19.25mm; L: 238mm; high speed steel Type of power tool accessories: drill bit Tools application: cast iron; copper alloy; graphite; steel; tool steel Drill features: grind blade Material: high speed steel Manufacture class: industrial Drill diameter: 19.25mm Working part length: 140mm Length: 238mm Manufacturer series: MAYKESTAG Kind of package: film; separately Conform to the norm: DIN 338 RN Kind of drill bit: for metal |
auf Bestellung 1 Stücke: Lieferzeit 14-21 Tag (e) |
|