10021149 ESSENTRA
Hersteller: ESSENTRA
Category: Caps Plugs and Masking
Description: Stopper; H: 11.5mm; push-in,snap-fastener; Flange dia: 28.6mm
Colour: black
Mounting: push-in; snap-fastener
Engineering PN: PGM-29
Material: polyamide
Type of mounting element: stopper
Flammability rating: UL94V-2
Panel thickness: max. 3.2mm
Height: 11.5mm
Panel cutout diameter: 22.5mm
Flange diameter: 28.6mm
Anzahl je Verpackung: 1 Stücke
Category: Caps Plugs and Masking
Description: Stopper; H: 11.5mm; push-in,snap-fastener; Flange dia: 28.6mm
Colour: black
Mounting: push-in; snap-fastener
Engineering PN: PGM-29
Material: polyamide
Type of mounting element: stopper
Flammability rating: UL94V-2
Panel thickness: max. 3.2mm
Height: 11.5mm
Panel cutout diameter: 22.5mm
Flange diameter: 28.6mm
Anzahl je Verpackung: 1 Stücke
auf Bestellung 184 Stücke:
Lieferzeit 7-14 Tag (e)
| Anzahl | Preis |
|---|---|
| 184+ | 0.39 EUR |
| 200+ | 0.36 EUR |
Produktrezensionen
Produktbewertung abgeben
Technische Details 10021149 ESSENTRA
Category: Caps Plugs and Masking, Description: Stopper; H: 11.5mm; push-in,snap-fastener; Flange dia: 28.6mm, Colour: black, Mounting: push-in; snap-fastener, Engineering PN: PGM-29, Material: polyamide, Type of mounting element: stopper, Flammability rating: UL94V-2, Panel thickness: max. 3.2mm, Height: 11.5mm, Panel cutout diameter: 22.5mm, Flange diameter: 28.6mm, Anzahl je Verpackung: 1 Stücke.
Weitere Produktangebote 10021149 nach Preis ab 0.39 EUR bis 0.39 EUR
| Foto | Bezeichnung | Hersteller | Beschreibung |
Verfügbarkeit |
Preis | ||||
|---|---|---|---|---|---|---|---|---|---|
![]() +1 |
10021149 | Hersteller : ESSENTRA |
Category: Caps Plugs and Masking Description: Stopper; H: 11.5mm; push-in,snap-fastener; Flange dia: 28.6mm Colour: black Mounting: push-in; snap-fastener Engineering PN: PGM-29 Material: polyamide Type of mounting element: stopper Flammability rating: UL94V-2 Panel thickness: max. 3.2mm Height: 11.5mm Panel cutout diameter: 22.5mm Flange diameter: 28.6mm |
auf Bestellung 184 Stücke: Lieferzeit 14-21 Tag (e) |
|
