 
66.2040-22 STÄUBLI
                                                                                Hersteller: STÄUBLI
Category: 4mm Banana Plugs
Description: Connector: 4mm banana; plug; 32A; 1kV; red; insulated; 2.5mm2
Type of lab connector: 4mm banana
Connector: plug
Rated voltage: 1kV
Current rating: 32A
Colour: red
Contact plating: nickel plated
Mounting: soldered
Connector variant: insulated
Conform to the norm: CAT II 1000V; CAT III 600V; EN 61010
Max. wire diameter: 3.9mm
Length: 65mm
Max cable section: 2.5mm2
            
                    Category: 4mm Banana Plugs
Description: Connector: 4mm banana; plug; 32A; 1kV; red; insulated; 2.5mm2
Type of lab connector: 4mm banana
Connector: plug
Rated voltage: 1kV
Current rating: 32A
Colour: red
Contact plating: nickel plated
Mounting: soldered
Connector variant: insulated
Conform to the norm: CAT II 1000V; CAT III 600V; EN 61010
Max. wire diameter: 3.9mm
Length: 65mm
Max cable section: 2.5mm2
auf Bestellung 134 Stücke:
Lieferzeit 14-21 Tag (e)
| Anzahl | Preis | 
|---|---|
| 30+ | 2.45 EUR | 
| 34+ | 2.13 EUR | 
| 36+ | 2 EUR | 
Produktrezensionen
Produktbewertung abgeben
Technische Details 66.2040-22 STÄUBLI
Category: 4mm Banana Plugs, Description: Connector: 4mm banana; plug; 32A; 1kV; red; insulated; 2.5mm2, Type of lab connector: 4mm banana, Connector: plug, Rated voltage: 1kV, Current rating: 32A, Colour: red, Contact plating: nickel plated, Mounting: soldered, Connector variant: insulated, Conform to the norm: CAT II 1000V; CAT III 600V; EN 61010, Max. wire diameter: 3.9mm, Length: 65mm, Max cable section: 2.5mm2. 
Weitere Produktangebote 66.2040-22 nach Preis ab 2 EUR bis 3.46 EUR
| Foto | Bezeichnung | Hersteller | Beschreibung | Verfügbarkeit | Preis | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 66.2040-22 | Hersteller : STДUBLI | SAL-4N-39-TW-22 4mm Banana Plugs | auf Bestellung 133 Stücke:Lieferzeit 7-14 Tag (e) | 
 | |||||||||||
| 66.2040-22 | Hersteller : Staubli | 66.2040-22 | auf Bestellung 217 Stücke:Lieferzeit 14-21 Tag (e) | 
 |