
BM70206 BM GROUP
Hersteller: BM GROUP
Category: Bootlace ferrule and butt splice
Description: Tip: butt splice; non-insulated; aluminum; 120mm2; crimped; 4/0AWG
Electrical mounting: crimped
Connectors application: for aluminium cables
Mechanical mounting: for cable
Ferrule variant: non-insulated
Wire cross-section: 1.2cm2
Wire size: 4/0AWG
Contact material: aluminum
Type of tip: butt splice
Anzahl je Verpackung: 1 Stücke
Category: Bootlace ferrule and butt splice
Description: Tip: butt splice; non-insulated; aluminum; 120mm2; crimped; 4/0AWG
Electrical mounting: crimped
Connectors application: for aluminium cables
Mechanical mounting: for cable
Ferrule variant: non-insulated
Wire cross-section: 1.2cm2
Wire size: 4/0AWG
Contact material: aluminum
Type of tip: butt splice
Anzahl je Verpackung: 1 Stücke
auf Bestellung 8 Stücke:
Lieferzeit 7-14 Tag (e)
Anzahl | Preis |
---|---|
6+ | 12.14 EUR |
7+ | 10.61 EUR |
20+ | 10.21 EUR |
Produktrezensionen
Produktbewertung abgeben
Technische Details BM70206 BM GROUP
Category: Bootlace ferrule and butt splice, Description: Tip: butt splice; non-insulated; aluminum; 120mm2; crimped; 4/0AWG, Electrical mounting: crimped, Connectors application: for aluminium cables, Mechanical mounting: for cable, Ferrule variant: non-insulated, Wire cross-section: 1.2cm2, Wire size: 4/0AWG, Contact material: aluminum, Type of tip: butt splice, Anzahl je Verpackung: 1 Stücke.
Weitere Produktangebote BM70206 nach Preis ab 10.61 EUR bis 12.14 EUR
Foto | Bezeichnung | Hersteller | Beschreibung |
Verfügbarkeit |
Preis | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|
![]() |
BM70206 | Hersteller : BM GROUP |
Category: Bootlace ferrule and butt splice Description: Tip: butt splice; non-insulated; aluminum; 120mm2; crimped; 4/0AWG Electrical mounting: crimped Connectors application: for aluminium cables Mechanical mounting: for cable Ferrule variant: non-insulated Wire cross-section: 1.2cm2 Wire size: 4/0AWG Contact material: aluminum Type of tip: butt splice |
auf Bestellung 8 Stücke: Lieferzeit 14-21 Tag (e) |
|