
TK 20 LED 1,20 L25 TEKON
Hersteller: TEKON
Category: Contact Probes
Description: Test needle; Operational spring compression: 4mm; Min.pitch: 4mm
Type of test accessories: test needle
Minimum pitch: 4mm
Maksimum spring compression: 5mm
Operational spring compression: 4mm
Tip diameter: 1.2mm
Related items: TK20LED
Measuring instruments application: LED-testing
Operating temperature: -40...70°C
Anzahl je Verpackung: 1 Stücke
Category: Contact Probes
Description: Test needle; Operational spring compression: 4mm; Min.pitch: 4mm
Type of test accessories: test needle
Minimum pitch: 4mm
Maksimum spring compression: 5mm
Operational spring compression: 4mm
Tip diameter: 1.2mm
Related items: TK20LED
Measuring instruments application: LED-testing
Operating temperature: -40...70°C
Anzahl je Verpackung: 1 Stücke
auf Bestellung 5 Stücke:
Lieferzeit 7-14 Tag (e)
Anzahl | Preis |
---|---|
4+ | 18.02 EUR |
5+ | 14.3 EUR |
Produktrezensionen
Produktbewertung abgeben
Technische Details TK 20 LED 1,20 L25 TEKON
Category: Contact Probes, Description: Test needle; Operational spring compression: 4mm; Min.pitch: 4mm, Type of test accessories: test needle, Minimum pitch: 4mm, Maksimum spring compression: 5mm, Operational spring compression: 4mm, Tip diameter: 1.2mm, Related items: TK20LED, Measuring instruments application: LED-testing, Operating temperature: -40...70°C, Anzahl je Verpackung: 1 Stücke.
Weitere Produktangebote TK 20 LED 1,20 L25 nach Preis ab 14.3 EUR bis 18.02 EUR
Foto | Bezeichnung | Hersteller | Beschreibung |
Verfügbarkeit |
Preis | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|
![]() |
TK 20 LED 1,20 L25 | Hersteller : TEKON |
Category: Contact Probes Description: Test needle; Operational spring compression: 4mm; Min.pitch: 4mm Type of test accessories: test needle Minimum pitch: 4mm Maksimum spring compression: 5mm Operational spring compression: 4mm Tip diameter: 1.2mm Related items: TK20LED Measuring instruments application: LED-testing Operating temperature: -40...70°C |
auf Bestellung 5 Stücke: Lieferzeit 14-21 Tag (e) |
|