EAL1G DIOTEC SEMICONDUCTOR
Hersteller: DIOTEC SEMICONDUCTOR
Category: SMD universal diodes
Description: Diode: rectifying; SMD; 400V; 1A; 50ns; MiniMELF plastic; Ifsm: 30A
Max. off-state voltage: 0.4kV
Max. forward voltage: 1.35V
Load current: 1A
Max. forward impulse current: 30A
Case: MiniMELF plastic
Semiconductor structure: single diode
Features of semiconductor devices: avalanche breakdown effect
Max. load current: 8A
Kind of package: reel; tape
Type of diode: rectifying
Mounting: SMD
Reverse recovery time: 50ns
Leakage current: 50µA
| Anzahl | Preis |
|---|---|
| 670+ | 0.11 EUR |
| 1060+ | 0.068 EUR |
| 1200+ | 0.06 EUR |
| 1320+ | 0.054 EUR |
Produktrezensionen
Produktbewertung abgeben
Technische Details EAL1G DIOTEC SEMICONDUCTOR
Description: DIODE AVALANCHE 400V 1A DO213AA, Current - Reverse Leakage @ Vr: 3 µA @ 400 V, Voltage - Forward (Vf) (Max) @ If: 1.35 V @ 1 A, Voltage - DC Reverse (Vr) (Max): 400 V, Part Status: Active, Operating Temperature - Junction: -50°C ~ 175°C, Supplier Device Package: DO-213AA, MINI-MELF, Current - Average Rectified (Io): 1A, Technology: Avalanche, Reverse Recovery Time (trr): 50 ns, Speed: Fast Recovery =< 500ns, > 200mA (Io), Mounting Type: Surface Mount, Package / Case: DO-213AA, Packaging: Tape & Reel (TR).
Weitere Produktangebote EAL1G nach Preis ab 0.15 EUR bis 0.15 EUR
| Foto | Bezeichnung | Hersteller | Beschreibung |
Verfügbarkeit |
Preis | ||||
|---|---|---|---|---|---|---|---|---|---|
|
EAL1G | Hersteller : Diotec Semiconductor |
Description: DIODE AVALANCHE 400V 1A DO213AACurrent - Reverse Leakage @ Vr: 3 µA @ 400 V Voltage - Forward (Vf) (Max) @ If: 1.35 V @ 1 A Voltage - DC Reverse (Vr) (Max): 400 V Part Status: Active Operating Temperature - Junction: -50°C ~ 175°C Supplier Device Package: DO-213AA, MINI-MELF Current - Average Rectified (Io): 1A Technology: Avalanche Reverse Recovery Time (trr): 50 ns Speed: Fast Recovery =< 500ns, > 200mA (Io) Mounting Type: Surface Mount Package / Case: DO-213AA Packaging: Tape & Reel (TR) |
auf Bestellung 2500 Stücke: Lieferzeit 10-14 Tag (e) |
|

