MCR12NG LITTELFUSE
Hersteller: LITTELFUSE
Category: SMD/THT thyristors
Description: Thyristor; 800V; Ifmax: 12A; 7.8A; Igt: 8mA; TO220AB; THT; tube
Mounting: THT
Type of thyristor: thyristor
Case: TO220AB
Gate current: 8mA
Max. load current: 12A
Load current: 7.8A
Max. off-state voltage: 0.8kV
Max. forward impulse current: 100A
Kind of package: tube
Features of semiconductor devices: glass passivated
| Anzahl | Preis |
|---|---|
| 37+ | 1.96 EUR |
| 41+ | 1.74 EUR |
| 47+ | 1.54 EUR |
| 100+ | 1.46 EUR |
Produktrezensionen
Produktbewertung abgeben
Technische Details MCR12NG LITTELFUSE
Description: SCR 800V 12A TO220AB, Packaging: Box, Package / Case: TO-220-3, Mounting Type: Through Hole, SCR Type: Standard Recovery, Operating Temperature: -40°C ~ 125°C, Current - Hold (Ih) (Max): 40 mA, Current - Gate Trigger (Igt) (Max): 20 mA, Current - Non Rep. Surge 50, 60Hz (Itsm): 100A @ 60Hz, Voltage - Gate Trigger (Vgt) (Max): 1 V, Voltage - On State (Vtm) (Max): 2.2 V, Current - Off State (Max): 10 µA, Supplier Device Package: TO-220AB, Current - On State (It (RMS)) (Max): 12 A, Voltage - Off State: 800 V.
Weitere Produktangebote MCR12NG nach Preis ab 1.39 EUR bis 4.51 EUR
| Foto | Bezeichnung | Hersteller | Beschreibung |
Verfügbarkeit |
Preis | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
MCR12NG | Hersteller : Littelfuse Inc. |
Description: SCR 800V 12A TO220ABPackaging: Box Package / Case: TO-220-3 Mounting Type: Through Hole SCR Type: Standard Recovery Operating Temperature: -40°C ~ 125°C Current - Hold (Ih) (Max): 40 mA Current - Gate Trigger (Igt) (Max): 20 mA Current - Non Rep. Surge 50, 60Hz (Itsm): 100A @ 60Hz Voltage - Gate Trigger (Vgt) (Max): 1 V Voltage - On State (Vtm) (Max): 2.2 V Current - Off State (Max): 10 µA Supplier Device Package: TO-220AB Current - On State (It (RMS)) (Max): 12 A Voltage - Off State: 800 V |
auf Bestellung 167 Stücke: Lieferzeit 10-14 Tag (e) |
|
||||||||||
|
|
MCR12NG | Hersteller : Littelfuse |
SCRs 800V 12A |
auf Bestellung 1276 Stücke: Lieferzeit 10-14 Tag (e) |
|
