TLP3107(TP,F Toshiba Semiconductor and Storage
Hersteller: Toshiba Semiconductor and Storage
Description: SSR RELAY SPST-NO 3.3A 0-60V
Approval Agency: CSA, cUL, UL
Operating Temperature: -40°C ~ 85°C
On-State Resistance (Max): 60 mOhms
Voltage - Load: 0 V ~ 60 V
Supplier Device Package: 6-SOP
Load Current: 3.3 A
Termination Style: Gull Wing
Circuit: SPST-NO (1 Form A)
Voltage - Input: 1.33VDC
Mounting Type: Surface Mount
Output Type: AC, DC
Package / Case: 6-SOP (0.173", 4.40mm)
Packaging: Tape & Reel (TR)
| Anzahl | Preis |
|---|---|
| 2500+ | 3.01 EUR |
Produktrezensionen
Produktbewertung abgeben
Technische Details TLP3107(TP,F Toshiba Semiconductor and Storage
Description: SSR RELAY SPST-NO 3.3A 0-60V, Approval Agency: CSA, cUL, UL, Operating Temperature: -40°C ~ 85°C, On-State Resistance (Max): 60 mOhms, Voltage - Load: 0 V ~ 60 V, Supplier Device Package: 6-SOP, Load Current: 3.3 A, Termination Style: Gull Wing, Circuit: SPST-NO (1 Form A), Voltage - Input: 1.33VDC, Mounting Type: Surface Mount, Output Type: AC, DC, Package / Case: 6-SOP (0.173", 4.40mm), Packaging: Tape & Reel (TR).
Weitere Produktangebote TLP3107(TP,F nach Preis ab 2.76 EUR bis 6.44 EUR
| Foto | Bezeichnung | Hersteller | Beschreibung |
Verfügbarkeit |
Preis | ||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
TLP3107(TP,F | Hersteller : Toshiba |
MOSFET Output Optocouplers Photorelay MOSFET Output |
auf Bestellung 4644 Stücke: Lieferzeit 10-14 Tag (e) |
|
||||||||||||||||
|
TLP3107(TP,F | Hersteller : Toshiba Semiconductor and Storage |
Description: SSR RELAY SPST-NO 3.3A 0-60VApproval Agency: CSA, cUL, UL Operating Temperature: -40°C ~ 85°C On-State Resistance (Max): 60 mOhms Voltage - Load: 0 V ~ 60 V Supplier Device Package: 6-SOP Load Current: 3.3 A Termination Style: Gull Wing Circuit: SPST-NO (1 Form A) Voltage - Input: 1.33VDC Mounting Type: Surface Mount Output Type: AC, DC Package / Case: 6-SOP (0.173", 4.40mm) Packaging: Cut Tape (CT) |
auf Bestellung 3893 Stücke: Lieferzeit 10-14 Tag (e) |
|
