
ZW-02-20-G-D-600-260 Samtec Inc.

Description: CONN BRD STACK .100" 4POS
Packaging: Bulk
Color: Black
Mounting Type: Through Hole
Pitch: 0.100" (2.54mm)
Row Spacing: 0.100" (2.54mm)
Termination: Solder
Contact Finish - Post (Mating): Gold
Contact Finish Thickness - Post (Mating): 10.0µin (0.25µm)
Number of Rows: 2
Number of Positions: 4
Length - Overall Pin: 1.130" (28.702mm)
Length - Post (Mating): 0.270" (6.858mm)
Length - Stack Height: 0.600" (15.240mm)
Length - Tail: 0.260" (6.604mm)
auf Bestellung 2475 Stücke:
Lieferzeit 10-14 Tag (e)
Anzahl | Preis |
---|---|
12+ | 1.58 EUR |
Produktrezensionen
Produktbewertung abgeben
Technische Details ZW-02-20-G-D-600-260 Samtec Inc.
Description: CONN BRD STACK .100" 4POS, Packaging: Bulk, Color: Black, Mounting Type: Through Hole, Pitch: 0.100" (2.54mm), Row Spacing: 0.100" (2.54mm), Termination: Solder, Contact Finish - Post (Mating): Gold, Contact Finish Thickness - Post (Mating): 10.0µin (0.25µm), Number of Rows: 2, Number of Positions: 4, Length - Overall Pin: 1.130" (28.702mm), Length - Post (Mating): 0.270" (6.858mm), Length - Stack Height: 0.600" (15.240mm), Length - Tail: 0.260" (6.604mm).
Weitere Produktangebote ZW-02-20-G-D-600-260 nach Preis ab 0.85 EUR bis 2.87 EUR
Foto | Bezeichnung | Hersteller | Beschreibung |
Verfügbarkeit |
Preis | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() |
ZW-02-20-G-D-600-260 | Hersteller : Samtec |
![]() |
auf Bestellung 2 Stücke: Lieferzeit 10-14 Tag (e) |
|
||||||||||||
![]() |
ZW-02-20-G-D-600-260 | Hersteller : Samtec Inc. |
![]() Packaging: Bulk Color: Black Mounting Type: Through Hole Pitch: 0.100" (2.54mm) Row Spacing: 0.100" (2.54mm) Termination: Solder Contact Finish - Post (Mating): Gold Contact Finish Thickness - Post (Mating): 10.0µin (0.25µm) Number of Rows: 2 Number of Positions: 4 Length - Overall Pin: 1.130" (28.702mm) Length - Post (Mating): 0.270" (6.858mm) Length - Stack Height: 0.600" (15.240mm) Length - Tail: 0.260" (6.604mm) |
auf Bestellung 4109 Stücke: Lieferzeit 10-14 Tag (e) |
|